【24h】

A New Method for Evaluating the Risk of Engineering Project-DHGF Algorithm

机译:一种评估工程项目风险的新方法-DHGF算法

获取原文

摘要

The risk management to the construction engineering plays an ever increasing role in modern engineering project management. In this study, a new risk evaluation method of engineering project is proposed-the DHGF algorithm, its character is to choose certain evaluation methods at different stages of the evaluation process. During the evaluation, the improved Delphi method is used to establish the comprehensive evaluation index system; AHP is used to determine the weight of every evaluation index; the fuzzy evaluation method which introduced grey correlation analysis is used to determine the risk grade and make the comprehensive evaluation. DHGF algorithm brings together the merits of Delphi, AHP, grey correlation analysis and fuzzy comprehensive evaluation and provides a scientific and rational approach to evaluate the owner of engineering project.
机译:建筑工程的风险管理在现代工程项目管理中起着越来越重要的作用。本文提出了一种新的工程项目风险评估方法——DHGF算法,其特征是在评估过程的不同阶段选择一定的评估方法。在评价过程中,采用改进的德尔菲法建立了综合评价指标体系。层次分析法用于确定每个评估指标的权重;采用引入灰色关联分析的模糊评价方法确定风险等级,进行综合评价。 DHGF算法综合了Delphi,AHP,灰色关联分析和模糊综合评价的优点,为评价工程项目的所有者提供了科学合理的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号