首页> 外文会议>Structural Engineering and Public Safety >Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake
【24h】

Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake

机译:快速通道桥梁缩进:在Pomme de Terre湖上的64号公路

获取原文
获取原文并翻译 | 示例

摘要

This innovative method of using full-width full-depth precast panels for overnight bridge deck replacements proved to be cost competitive with staged construction and beneficial for minimizing the impact to the traveling public and local economies. The benefits to the local community included minimizing the impact on tourism, maintaining emergency vehicle and school bus access during the day, and reducing the construction impact from daily for two years to 2?months of overnight work. This 揻ast-track?concept could be further extended to replacing bridge decks in areas with high traffic control costs, bridges with skewed supports, or on larger bridge rehabilitation projects where construction time is a significant factor.
机译:这种采用全宽度,全深度预制板进行夜间桥梁甲板更换的创新方法,与分阶段施工相比具有成本竞争力,并且有利于最大程度地减少对出行的公共和地方经济的影响。给当地社区带来的好处包括最大程度地减少对旅游业的影响,白天保持紧急车辆和校车的通行以及将对建筑的影响从每天的两年减少到过夜工作的2个月。这种“快速跟踪”的概念可以进一步扩展到在交通控制成本高的地区,桥架偏斜的支撑桥或在施工时间很重要的大型桥梁修复项目中更换桥面板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号