首页> 外文会议>Structures Congress on Structural Engineering and Public Safety >Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake
【24h】

Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake

机译:快速轨道桥redecking:64路线,在Pomme de Terre Lake

获取原文

摘要

This innovative method of using full-width full-depth precast panels for overnight bridge deck replacements proved to be cost competitive with staged construction and beneficial for minimizing the impact to the traveling public and local economies. The benefits to the local community included minimizing the impact on tourism, maintaining emergency vehicle and school bus access during the day, and reducing the construction impact from daily for two years to 2?months of overnight work. This 揻ast-track?concept could be further extended to replacing bridge decks in areas with high traffic control costs, bridges with skewed supports, or on larger bridge rehabilitation projects where construction time is a significant factor.
机译:这种采用全宽全深度预制面板用于隔夜桥式甲板的创新方法证明是与上演结构具有成本竞争力,并有利于最大限度地减少对旅行公共和当地经济的影响。本地社区的益处包括最大限度地减少对旅游业的影响,维护当天的紧急车辆和校车通道,并将每日的建设影响降低两年至2个月的过夜工作。这揻ast-track?概念可以进一步扩展到更换具有高交通管制成本的领域的桥式甲板,具有偏斜支撑的桥梁,或在施工时间是一个重要因素的较大桥梁康复项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号