Challenges of No. 7 Subway Line Extension Project's TBM Shaft Design

机译:地铁七号线扩建工程TBM竖井设计面临的挑战

获取原文
获取原文并翻译 | 示例

摘要

As part of the New York City’s redevelopment of the far west side of the mid-town Manhattan, the No. 7 Subway Line Extension project will add 1.5 miles of twin bored tunnels to the existing subway line and two new subway stations. The underground construction has two major components: (1) Running Tunnel & 34th Street Station Cavern, and (2) Tenth Avenue Station & Times Square Connection. The running tunnel contract will have a TBM launching shaft (Shaft A), an Adit connecting Shaft A to the running tunnels, and TBM Assembly Chamber at the southern end of the project, i.e., near 25th Street at Eleventh Avenue, where tunnel excavation begins. This paper will discuss challenges of the design and construction of Shaft A where it meets the Adit.
机译:作为纽约市对曼哈顿中城西侧的重新开发的一部分,地铁7号线扩建项目将为现有地铁线路和两个新地铁站增加1.5英里的双挖隧道。地下建筑有两个主要部分:(1)连续隧道和第34街车站洞穴,以及(2)第十大道车站和时代广场连接处。运营中的隧道合同将有一个TBM发射井(A轴),一个将A轴连接到正在运行的隧道的Adit,以及位于项目南端的TBM装配室,即靠近第11大街25号街的隧道开挖工作。本文将讨论轴A与Adit相遇的设计和建造所面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号