首页> 外文会议>SMiRT 16;International conference on structural mechanics in reactor technology >Structural Analysis of the Pressurizer Relief Valve Discharge Piping of NPP Angra I
【24h】

Structural Analysis of the Pressurizer Relief Valve Discharge Piping of NPP Angra I

机译:核电厂Angra I的泄压阀排放管道结构分析。

获取原文

摘要

The pressurizer relief and safety valve system provides the reactor coolant system overpressure protection and,therefore, it is fundamental for the security of a nuclear plant. This paper suggests some modifications to the original pipingconfiguration of the pressurizer relief and safety valve system, in accordance with the recommendations of NUREG-0578(TMI-2 Lessons Learned Task Force Status Report and Short -Term Recommendations). These modifications were proposedin order to reduce the high stress levels induced by the thermal-hydrodynamic loads caused by the discharge of the subcooledwater during the relief valve opening. The thermal-hydrodynamic loads were calculated using the computer codesRELAP5/MOD2, PREPREF and REFORC. Several thermal-hydraulics models were tested considering the influence of theseal water heating and the simultaneous opening of the valves to reduce these loads. The piping structural analysis wasperformed using the computer program system KWUROHR.
机译:增压器溢流和安全阀系统为反应堆冷却剂系统提供过压保护,因此,它对于核电站的安全至关重要。本文根据NUREG-0578(TMI-2经验教训特别工作组状态报告和短期建议)的建议,对增压器溢流阀和安全阀系统的原始管道配置提出了一些修改建议。提出这些修改是为了减小由安全阀打开期间过冷水的排放所引起的热流体动力载荷引起的高应力水平。使用计算机代码RELAP5 / MOD2,PREPREF和REFORC计算热流体动力载荷。考虑到这些热水的影响以及同时打开阀门以减少这些负荷的影响,测试了几种热工液压模型。使用计算机程序系统KWUROHR进行管道结构分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号