【24h】

Integrated material resource planning/scheduling in atime-compressed world

机译:在时间紧迫的世界中整合材料资源计划/计划

获取原文
获取原文并翻译 | 示例

摘要

Summary form only given. Advanced systems are based on a model ofnthe factory that schedules (and continually reschedules) the use ofnmaterial, machines and people resources to demands and orders placed onnthe factory. Rule-based systems are used to route orders to processes innthe factory, to select material based on current inventory levels andnprocessing alternative, and to select workstations and staff pools fornthe processes. The integrated materials resources planning is tied tonactual factory capacities. This integration insures that the material isnavailable when it can be needed and when it can be used. The advantagenover other systems is that standard MRP2 approaches sometimes requirenraw material to be purchased too early based on standard lead-times; innother cases the standard MRP2 systems can result in later delivery ofnproducts
机译:仅提供摘要表格。先进的系统基于工厂的模型,该模型可调度(并不断重新安排)对材料,机器和人力资源的使用,以满足工厂中的需求和订单。基于规则的系统用于将订单路由到工厂中的流程,基于当前库存水平和处理备选方案选择物料,以及为流程选择工作站和人员库。综合材料资源计划与工厂实际产能挂钩。这种集成确保了在需要和使用材料时不可用该材料。与其他系统相比,优点是标准MRP2方法有时需要根据标准交货时间过早购买原材料。在其他情况下,标准MRP2系统可能会导致以后交付产品

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号