Slope stability of final highwall slope at West Bokaro Collieries, India

机译:印度西博卡罗矿场最终的高墙边坡的边坡稳定性

获取原文
获取原文并翻译 | 示例

摘要

The paper deals with geotechnical study for the final slope of 140m high final open pit mine slope at SE Block of West Bokaro Collieries,Tata Steel.It is mainly characterized by sandstone and coal.The bulk density and direct shear tests were conducted at Rock Mechanics Laboratory of CIMFR on the samples collected from the field.The geotechnical mapping was done on the exposed benches of the quarry as per the norms of International Society of Rock Mechanics (ISRM 1978).The kinematic analysis was done to determine the critical orientation of structural discontinuities.After identifying kinematically possible failure modes,detailed slope stability analysis was carried out by GALENA software based on limit equilibrium method.The present study reveals that the 140m high final slope could be designed with 47 degree overall slope angle.The sensitivity analysis shows that the influence of water is also alarming.It was recommended that the slope should be kept in drained geomining condition by providing suitable drainage and keeping drainage effectively maintained.
机译:本文主要针对塔塔钢铁公司西博卡罗煤矿SE段SE最终140m高露天矿山边坡的岩土工程研究,主要特征是砂岩和煤,在岩石力学中进行了堆积密度和直接剪切试验。 CIMFR实验室对从现场采集的样品进行了研究。根据国际岩石力学学会(ISRM 1978)的规范在采石场的裸露台阶上进行了岩土测绘,并进行了运动学分析以确定结构的关键方向在确定运动学上可能的破坏模式后,基于极限平衡法,利用GALENA软件进行了详细的边坡稳定性分析。本研究表明,可以设计47m的整体边坡角来设计140m高的最终边坡。水的影响也令人震惊。建议通过以下方法将边坡保持在排水的采矿环境中:提供适当的排水并保持排水有效地保持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号