【24h】

SUSTAINABLE GUIDELINES FOR MANAGING DEMOLITION WASTE IN EGYPT

机译:埃及管理拆除废物的可持续准则

获取原文
获取原文并翻译 | 示例

摘要

Demolition activities, including renovation/remodelling works and complete or selective removal/demolishing of existing structures either by man-made processes or by natural disasters, create an extensive amount of wastes. These demolition wastes are characterised as heterogeneous mixtures of building materials that are usually contaminated with chemicals and dirt. In developing countries, it is estimated that demolition wastes comprise 20% to 30% of the total annual solid wastes. In Egypt, the daily quantity of construction and demolition (C&D) waste has been estimated as 10,000 tonnes. That is equivalent to one third of the total daily municipal solid wastes generated per day in Egypt. The objective of this paper is to recommend practical guidelines to be added to the Egyptian Executive Regulations 338/1995 of the Egyptian Environmental Law no. 4/1994 to manage the amount and types of demolition waste in Egypt. These guidelines were scientifically tailored and were based on the responses from 35 Egyptian construction companies regarding how construction waste is handled on their projects, and from 40 samples of people with different backgrounds on ways to reduce the disposal of building materials waste in Egypt. The proposed guidelines were evaluated by a number of prominent national and multinational construction organisations in Egypt. This paper summarises the proposed Egyptian demolition waste management guidelines, which cover: (1) the waste management hierarchy based on the '4Rs' Golden Rule of Reducing, Reusing, Recycling and Recovering of waste; (2) the different implementation stages which start from the early planning phase, followed by the tendering and contract formulation phase and finally the execution phase; (3) the various techniques, methodologies, procedures and strategies recommended to reduce the amount of waste and (4) the degree of involvement of all the construction industry parties (owner, engineer, designer, and contractor) in the implementation of the guidelines.
机译:拆除活动,包括翻新/重塑工程以及通过人为过程或自然灾害对现有结构进行完全或有选择的拆除/拆除,造成了大量的废物。这些拆卸废料的特征是建筑材料的异质混合物,通常会被化学物质和污垢污染。据估计,在发展中国家,拆除废物占年度固体废物总量的20%至30%。在埃及,估计每天的拆建废料为10,000吨。这相当于埃及每天产生的每日城市固体废物总量的三分之一。本文的目的是推荐实用的指南,以将其添加到《埃及环境法》第338/1995号埃及执行条例中。 4/1994来管理埃及的拆除废物的数量和类型。这些准则是科学定制的,是基于35家埃及建筑公司关于如何处理其项目中的建筑垃圾的答复,以及来自40名具有不同背景的人们的样本,这些人在埃及减少建筑材料垃圾的处置方式。埃及许多著名的国家和跨国建筑组织对拟议的准则进行了评估。本文总结了拟议的埃及拆除废物管理指南,其中包括:(1)基于“ 4Rs”减少,再利用,回收和回收废物的黄金法则的废物管理体系; (2)不同的执行阶段,从早期计划阶段开始,然后是招标和合同制定阶段,最后是执行阶段; (3)建议减少废物量的各种技术,方法,程序和策略,以及(4)所有建筑业相关方(业主,工程师,设计师和承包商)参与实施指南的程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号