This paper focuses on a bi-national water augmentation project within the borders of South Africa and Lesotho in Southern Africa, in accordance with a treaty signed in 1986. The world-class infrastructure project diverts water from the Senqu/Orange River system in Lesotho to South Africa's water-stressed economic driving force, the Gauteng region. Completed in 2001, the project was the first in which the state-owned Trans-Caledon Tunnel Authority (TCTA) was responsible for the development of infrastructure, In addition to being tasked with funding the water transfer part of the project, the TCTA is now responsible for overall debt management. Tunneling constituted a major component of the project: It entailed, inter alia, the building of three dams - the Katse, Mohale and Muela dams - an intake tower, a hydropower station, two transfer tunnels and a delivery tunnel. The Katse dam was a particular showpiece, being a double curvature concrete arch, 185m high and 710m along the crest. The design was the most cost-effective to span the wide U-shaped valley of the Malibamatso River, downstream of its confluence with the Bokong River. It also allowed water to be impounded at low risk while construction was taking place. Most significantly, an idea that was born in the deeply-incised valleys of Lesotho has now connected Lesotho and South Africa, not only as a symbol of their interdependence, but also of their joint efforts to secure a more prosperous dispensation for both countries.
机译:根据1986年签署的一项条约,本文着重研究了在南非和南部非洲莱索托边界内的一个国家加水项目。世界一流的基础设施项目将水从莱索托的Senqu / Orange River系统转移到南非水资源紧张的经济驱动力,豪登省地区。该项目于2001年完成,是第一个由国有的跨卡尔顿隧道管理局(TCTA)负责基础设施开发的项目。除了负责资助该项目的输水部分外,TCTA现在负责整体债务管理。隧道工程是该项目的主要组成部分:除其他外,包括修建三座水坝-凯塞,莫哈利和穆埃拉水坝-进水塔,水力发电站,两个转运隧道和一个输送隧道。凯瑟斯水坝是一个特别的展示品,它是一个双曲率的混凝土拱门,高185m,山顶沿710m。这种设计是最经济的方法,可跨越马里巴马特索河与博孔河汇合处下游的U形宽谷。它还可以在施工期间以低风险扣留水。最重要的是,一个起源于莱索托深谷的想法现在已经联系了莱索托和南非,这不仅象征着它们相互依存,而且象征着他们共同努力确保两国的繁荣发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号