Effect of Subcontracting on Construction Scheduling

机译:分包对施工进度的影响

获取原文
获取原文并翻译 | 示例

摘要

The right sequence of construction works and their positioning in time-schedule are unavoidable prerequisites for a high-quality construction process. Often a prepared schedule has serious problems in ignoring the necessary technological sequence of works or, if the technological order is correct, due to a lack of flexibility in case of any unpredicted changes. The necessity of planning the construction process according to various limitations and changes, technological correlations and resources provides a challenge to create a model that would allow preparing flexible schedules for construction tasks. Such a model should take into account the conditions, limitations and possibility of changes for specific construction sites on a case-by-case basis, and thus planning correctly the share of subcontracting. The paper discusses the possibilities for preparing a construction schedule and the effect of subcontracting within it. Also, the initial conditions and parameters of the simulation model for evaluation of different management strategies are determined.
机译:正确的施工顺序及其在时间表中的位置,是高质量施工过程的必然前提。通常,准备好的进度表会在忽略必要的技术工作顺序时出现严重的问题,或者,如果技术顺序正确,则由于在进行任何意外更改时缺乏灵活性,因此会出现严重的问题。根据各种限制和变化,技术关联和资源来计划施工过程的必要性给创建模型提供了挑战,该模型将允许为施工任务准备灵活的时间表。这种模型应根据具体情况考虑特定建筑工地的条件,局限性和变更可能性,从而正确规划分包合同的份额。本文讨论了准备施工进度表的可能性以及其中的分包效果。此外,确定用于评估不同管理策略的仿真模型的初始条件和参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号