Effect of Subcontracting on Construction Scheduling

机译:分包对施工调度的影响

获取原文
获取外文期刊封面目录资料

摘要

The right sequence of construction works and their positioning in time-schedule are unavoidable prerequisites for a high-quality construction process. Often a prepared schedule has serious problems in ignoring the necessary technological sequence of works or, if the technological order is correct, due to a lack of flexibility in case of any unpredicted changes. The necessity of planning the construction process according to various limitations and changes, technological correlations and resources provides a challenge to create a model that would allow preparing flexible schedules for construction tasks. Such a model should take into account the conditions, limitations and possibility of changes for specific construction sites on a case-by-case basis, and thus planning correctly the share of subcontracting. The paper discusses the possibilities for preparing a construction schedule and the effect of subcontracting within it. Also, the initial conditions and parameters of the simulation model for evaluation of different management strategies are determined.
机译:建筑工程的正确顺序及其在时间表中的定位是一种不可避免的高质量建筑过程的先决条件。由于在任何未预测的变化的情况下,如果在任何不受预测的变化的情况下缺乏灵活性,通常,准备的时间表通常存在严重的作品或如果技术顺序是正确的。根据各种限制和变化规划施工过程的必要性,技术相关性和资源提供了创建模型的挑战,该模型将允许为施工任务准备灵活的时间表。这种模型应考虑到具体建筑工地的条件,限制和可能性在逐案的基础上,从而正确规划分包的份额。本文讨论了准备施工时间表的可能性和分包在其中的效果。此外,确定了用于评估不同管理策略的仿真模型的初始条件和参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号