首页> 外文会议>(Re)Claiming the Underground Space >Metro Barcelona Linea 9 - Europe's greatest metro project with shield tunnel boring machines of large diameters
【24h】

Metro Barcelona Linea 9 - Europe's greatest metro project with shield tunnel boring machines of large diameters

机译:Metro Barcelona Linea 9-欧洲最大的地铁项目,配备大直径的盾构隧道掘进机

获取原文
获取原文并翻译 | 示例

摘要

The challenging new Metro Barcelona Linea 9 Project where tunnels of up to 10.950 m and 12.060 m diameter are going to be bored under a high-density urban area, is bound to be commenced in spring 2003. Variable and difficult underground conditions will undoubtedly set higher and new standards of quality, safety and schedule meeting in the whole of the construction process: from the TBM technology and the boring process to the ground improving and monitoring. Two EPB shields and one dual hard rock/soil TBM will be used.
机译:充满挑战的新地铁巴塞罗那Linea 9项目将在高密度城市地区开挖直径为10.950 m和12.060 m的隧道,该工程定于2003年春季开工。动荡而艰难的地下条件无疑将使隧道更高以及在整个施工过程中满足质量,安全和进度计划的新标准:从TBM技术和钻孔工艺到地面改进和监控。将使用两个EPB盾牌和一个双重硬岩土TBM。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号