首页> 外文会议>Rapid Excavation and Tunneling Conference 2015 proceedings >CHALLENGES IN TUNNELING WITH A HARD ROCK SLURRY TBM IN COLUMBUS, OHIO
【24h】

CHALLENGES IN TUNNELING WITH A HARD ROCK SLURRY TBM IN COLUMBUS, OHIO

机译:俄亥俄州哥伦布市采用硬岩淤泥隧道掘进机进行隧道的挑战

获取原文
获取原文并翻译 | 示例

摘要

The City of Columbus OSIS Augmentation Relief Sewer (OARS) is a major componentrnin the City’s Long Term Control Plan (LTCP) for CSOs. The alignment passes throughrnkarstic-solution featured limestone that called for a hard rock slurry pressure balancernTBM to control the large water volumes anticipated. The project is unique as it requiredrnthe utilization of several innovative ideas to drive one of the longest hard rock tunnelsrnusing a slurry TBM. The paper will explore several of these ideas such as; muck andrnslurry removal, installation of an upgraded slurry system during production mining, andrnseveral unique methods of cutterhead access.
机译:哥伦布市OSIS增强泄洪排污系统(OARS)是该市针对CSO的长期控制计划(LTCP)的主要组成部分。该路线经过岩溶溶液特有的石灰岩,该石灰岩要求硬岩浆压力平衡TBM以控制预期的大水量。该项目之所以独特,是因为它需要利用多种创新理念来驱动使用泥浆TBM的最长的硬岩隧道之一。本文将探讨其中的一些想法,例如;去除泥渣和泥浆,在生产采矿过程中安装升级的泥浆系统,以及几种独特的刀盘进入方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号