首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >THE RELATIONSHIP BETWEEN TUNNEL CONVERGENCE AND MACHINE OPERATIONAL PARAMETERS AND CHIP SIZE FOR DOUBLE SHIELD TBMS-A CASE HISTORY OF GHOMROUD WATER CONVEYANCE TUNNEL
【24h】

THE RELATIONSHIP BETWEEN TUNNEL CONVERGENCE AND MACHINE OPERATIONAL PARAMETERS AND CHIP SIZE FOR DOUBLE SHIELD TBMS-A CASE HISTORY OF GHOMROUD WATER CONVEYANCE TUNNEL

机译:双屏蔽TBMS的隧道收敛与机器操作参数和芯片尺寸之间的关系-GHOMROUD输水隧道的历史案例

获取原文
获取原文并翻译 | 示例

摘要

Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel convergence is a function of ground conditions (I.e., rock mass behavior, groundwater, in-situ stresses), size of the opening, and TBM operational parameters. The case study of Ghomroud water conveyance tunnel project in Central Iran, which is under construction using a double shield TBM, is used to examine the effect of rock parameters on tunnel convergence and hence on the need for over excavation and shield lubrication to avoid problems with the shield getting stuck. Although it is impractical to perform a continuous assessment of rock mass conditions within the shield or in the lined tunnel, results of field observations and subsequent studies show that the amount of the tunnel convergence has direct correlation with the percentage of fines and large rock fragments in the muck and TBM thrust/torque/ROP. These relationships have been examined and will be presented in this paper.
机译:开挖方法的选择,特别是在深部岩石隧道中使用屏蔽机械的方法,会受到地面会聚和挤压条件的严重影响。隧道收敛是地面条件(即岩体行为,地下水,原地应力),洞口大小和TBM操作参数的函数。伊朗中部Ghomroud输水隧洞项目的案例研究正在研究中,该项目正在使用双层盾构TBM进行施工,以检查岩石参数对隧道收敛的影响,从而研究过大开挖和盾构润滑的需要,以避免出现问题。盾牌被卡住了。尽管无法连续评估盾构或衬砌隧道内的岩体状况,但现场观察和随后的研究结果表明,隧道会聚的数量与细粉和大块碎石的百分比直接相关。渣土和TBM推力/扭矩/ ROP。这些关系已经过检查,将在本文中介绍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号