THE RELATIONSHIP BETWEEN TUNNEL CONVERGENCE AND MACHINE OPERATIONAL PARAMETERS AND CHIP SIZE FOR DOUBLE SHIELD TBMS-A CASE HISTORY OF GHOMROUD WATER CONVEYANCE TUNNEL

机译:双屏蔽TBMS隧道收敛与机器操作参数和芯片尺寸的关系 - 蜂委会水输送隧道的案例历史

获取原文

摘要

Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel convergence is a function of ground conditions (i.e., rock mass behavior, groundwater, in-situ stresses), size of the opening, and TBM operational parameters. The case study of Ghomroud water conveyance tunnel project in Central Iran, which is under construction using a double shield TBM, is used to examine the effect of rock parameters on tunnel convergence and hence on the need for over excavation and shield lubrication to avoid problems with the shield getting stuck. Although it is impractical to perform a continuous assessment of rock mass conditions within the shield or in the lined tunnel, results of field observations and subsequent studies show that the amount of the tunnel convergence has direct correlation with the percentage of fines and large rock fragments in the muck and TBM thrust/torque/ROP. These relationships have been examined and will be presented in this paper.
机译:隧道方法的选择,特别使用屏蔽机用于深层岩石隧道的应用可能受到地层收敛和挤压条件的存在受到严重影响。隧道收敛是地面条件的函数(即,岩石质量行为,地下水,原位应力),开口尺寸和TBM操作参数。使用双盾TBM正在建造的伊朗中央晒氏水输送隧道项目的案例研究用于检查岩石参数对隧道收敛的影响,从而需要对挖掘和屏蔽润滑的需求,以避免问题盾牌被卡住了。虽然对屏蔽内或衬里隧道内的岩石质量条件进行连续评估是不切实际的,但场观测结果和随后的研究表明,隧道会聚的量与细粒和大岩石碎片的百分比直接相关渣土和tbm推力/扭矩/ rop。已经检查了这些关系,并将在本文中提出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号