首页> 外文会议>Rapid Excavation and Tunneling Conference(2007 RETC); 2007; Toronto(CA) >SUCCESSFUL TUNNELING FOR WATER TUNNEL NO. 3, NEW YORK CITY, NEW YORK
【24h】

SUCCESSFUL TUNNELING FOR WATER TUNNEL NO. 3, NEW YORK CITY, NEW YORK

机译:成功进行水隧道的隧道3,纽约,纽约

获取原文
获取原文并翻译 | 示例

摘要

Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-mile long, 18'-11" OD Brooklyn Tunnel; the 5-mile long, 23'-2" OD Queens Tunnel, and the 9-mile long, 12'-4" OD Manhattan Tunnel. The three tunnels are the first major tunnels constructed in New York City rock utilizing the TBM method of construction. This paper describes and compares the three tunnel projects in terms of geology, construction methods, TBM's, rock and groundwater behavior, rates of advance and other performance data, and challenges and solutions encountered during the projects.
机译:介绍了3号纽约水隧道成功进行TBM隧道掘进的三个案例。隧道总长约10亿美元,包括5英里长的18'-11“ OD布鲁克林隧道; 5英里长的23'-2” OD皇后区隧道和9英里长的12'OD。 -4“ OD曼哈顿隧道。这三个隧道是在纽约市岩石中使用TBM施工方法建造的第一条主要隧道。本文从地质,施工方法,TBM,岩石和地下水方面描述和比较了这三个隧道项目行为,进度和其他绩效数据的比率,以及项目期间遇到的挑战和解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号