首页> 外文会议>Rapid Excavation and Tunneling Conference >SAFETY IMPROVEMENTS ON MERSEY TUNNELS
【24h】

SAFETY IMPROVEMENTS ON MERSEY TUNNELS

机译:梅西隧道的安全改进

获取原文

摘要

The need to modernise and increase the safety provision of older road tunnels raises challenges in maintaining the operation of the tunnel during such improvement works. The Mersey Kingsway twin road tunnels located in Liverpool UK, constructed in the late 1960s, have had three new cross passages constructed to allow emergency evacuation from one tunnel to the other tunnel and provide safer access for emergency services. The 3200m long road tunnels are lined with an unusual reinforced concrete steel-faced segmental lining with a paint finish. Construction of the cross passages occurred during night possessions with the tunnels returned to normal operation during the daytime. Constructed through waterbearing sandstone and lined with precast concrete segments, the passages required advance ground treatment and support works. This paper presents the historical background to the Mersey Tunnels and describes the procurement strategy, design and construction approach adopted for these important safety improvements.
机译:需要对旧式公路隧道进行现代化改造并增加安全性,这在进行此类改善工作期间,在维持隧道运营方面提出了挑战。位于英国利物浦的默西·金斯威(Mersey Kingsway)双路隧道建于1960年代后期,拥有三个新的交叉通道,可从一个隧道紧急疏散到另一个隧道,并为紧急服务提供更安全的通道。 3200m长的公路隧道内衬有不寻常的钢筋混凝土钢面分段衬砌,表面涂有油漆。穿越通道的施工在夜间进行,隧道在白天恢复了正常运行。这些通道是通过含水砂岩建造的,并衬有预制混凝土段,需要进行地面处理和支护工作。本文介绍了默西隧道的历史背景,并描述了用于这些重要安全改进的采购策略,设计和施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号