首页> 外文会议>PSE ASIA 2007: Program amp; Abstracts >Research on changing cycle scheduling for the spinpacks in polyester staple fiber plant
【24h】

Research on changing cycle scheduling for the spinpacks in polyester staple fiber plant

机译:涤纶短纤厂纺丝装的变更周期调度研究。

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses the changing cycle scheduling problem for the spinpacks in a typical polyester staple fiber plant. The problem is to determine when the spinpacks to be changed so as to minimize the total cost over a given planning horizon. The total cost consisting of the operating cost and the changeover cost for the spinpacks accounts for an important fraction in a polyester staple fiber production plant. In the paper, two mathematical methods based on optimization for changing cycle scheduling are proposed. The one is the economic order quantity (EOQ) method for long planning horizon. The other is a dynamic programming (DP) method for short planning horizon. The model and algorithm are tested by using the actual data set collected from a large-scale petrochemical plant; the computational results are compared to manual in the plant and verify the effectiveness and applicability of the proposed methods.
机译:本文解决了典型的聚酯短纤维工厂中纺丝组件不断变化的循环调度问题。问题是要确定何时更换纺丝组件,以便在给定的计划范围内将总成本降至最低。在涤纶短纤维生产厂中,由纺丝组件的运营成本和转换成本组成的总成本占重要部分。提出了两种基于优化的周期变更调度数学方法。一种是长计划期的经济订单数量(EOQ)方法。另一种是用于短期规划的动态规划(DP)方法。通过使用从大型石化厂收集的实际数据集测试模型和算法;计算结果与工厂中的手册进行了比较,并验证了所提出方法的有效性和适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号