首页> 外文会议>Proceedings of the Tenth IASTED European conference on power and energy systems. >PHYSICAL MODELING AND LABORATORY TESTING OF CAIRO-ASWAN 3-PHASE HIGH VOLTAGE TRANSMISSION LINE
【24h】

PHYSICAL MODELING AND LABORATORY TESTING OF CAIRO-ASWAN 3-PHASE HIGH VOLTAGE TRANSMISSION LINE

机译:开罗-阿斯旺三相高压输电线路的物理建模与实验室测试

获取原文
获取原文并翻译 | 示例

摘要

Double circuit 500 kV overhead transmission line interconnected between Cairo and Aswan in Egypt has been in operation for several decades. There is a requirement to study and evaluate the line performance under various loading conditions that it may be subjected to, especially that it runs over a distance that exceeds 700 km in length. The author presents the realization details and results of an analogue simulator of the high voltage transmission line. Specific dimensions and characteristics are designed to emulate the actual line performance. The line is modelled through several sections of two port networks and compared by the digital simulation of the same transmission line using MATLAB. Voltage variations are monitored across the laboratory model and thus appropriate reactive power compensation is suggested at the appropriate locations.
机译:在埃及的开罗和阿斯旺之间互连的500 kV双回架空输电线路已经运行了数十年。有必要研究和评估在各种负载条件下的线路性能,尤其是线路长度超过700 km时。作者介绍了高压传输线模拟模拟器的实现细节和结果。设计特定的尺寸和特性以模拟实际的生产线性能。通过两个端口网络的多个部分对线路进行建模,并使用MATLAB对同一条传输线的数字仿真进行比较。在整个实验室模型中监视电压变化,因此建议在适当的位置进行适当的无功功率补偿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号