【24h】

Simulation for planning and scheduling

机译:规划和调度仿真

获取原文
获取原文并翻译 | 示例

摘要

This paper discusses a simulation approach to production planning and scheduling utilized at Raytheon's Missile Systems Plant in Andover, Mass.* A GPSS model and computer program has been developed to simulate the production of some 35,000 printed wiring assemblies. There are a number of different types of assemblies, each of which follows a fixed sequence of operations performed at different work stations. This situation results in a large-scale queuing problem which must be solved by a dynamic technique like simulation. The output from the simulation is currently being used to determine lot size, manpower requirements and production schedules.

机译:

本文讨论了位于马萨诸塞州安多弗的雷神公司导弹系统工厂采用的生产计划和调度的仿真方法。*已开发出GPSS模型和计算机程序来仿真约35,000个印刷线路组件的生产。有多种不同类型的组件,每种组件遵循在不同工作站上执行的固定操作顺序。这种情况导致大规模排队问题,必须通过诸如模拟之类的动态技术来解决。仿真的输出当前用于确定批量,人力需求和生产进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号