This paper discusses a simulation approach to production planning and scheduling utilized at Raytheon's Missile Systems Plant in Andover, Mass.* A GPSS model and computer program has been developed to simulate the production of some 35,000 printed wiring assemblies. There are a number of different types of assemblies, each of which follows a fixed sequence of operations performed at different work stations. This situation results in a large-scale queuing problem which must be solved by a dynamic technique like simulation. The output from the simulation is currently being used to determine lot size, manpower requirements and production schedules.
本文讨论了位于马萨诸塞州安多弗的雷神公司导弹系统工厂采用的生产计划和调度的仿真方法。*已开发出GPSS模型和计算机程序来仿真约35,000个印刷线路组件的生产。有多种不同类型的组件,每种组件遵循在不同工作站上执行的固定操作顺序。这种情况导致大规模排队问题,必须通过诸如模拟之类的动态技术来解决。仿真的输出当前用于确定批量,人力需求和生产进度。 P>
机译:基于多目标规划模型仿真结果的台湾电力计划与调度
机译:用于高级供应链计划和调度的基于代理的模拟:需求分析的FAMASS方法论框架
机译:用于高级供应链计划和调度的基于代理的模拟:用于需求分析的FAMASS方法论框架
机译:使用后退/前进调度模拟集成生产规划和调度
机译:手术室计划和时间表:数学模型和仿真模型。
机译:伽玛刀治疗计划与调强放疗计划治疗颅底肿瘤的剂量学比较的模拟研究
机译:生产计划&控制:运营管理:特刊:行业应用仿真,计划和调度技术