首页> 外文会议>ICROS-SICE International Joint Conference >Integrated Production Planning and Scheduling Using Backward/Forward Scheduling Simulation
【24h】

Integrated Production Planning and Scheduling Using Backward/Forward Scheduling Simulation

机译:使用后退/前进调度模拟集成生产规划和调度

获取原文

摘要

This paper deals with release time planning to reduce lead times of jobs in make-to-order production environments. In traditional MRP-based planning system, lead times are estimated using historical data and past experience without precisely considering capacity constraints. The proposed method in this paper is based on precise backward and forward scheduling simulation. First, backward simulation in which simulation starts at each due date of job and sends it through the shop floor based on the backward sequence of its part routing is applied. Next, forward simulation is applied to modify the release times obtained by backward simulation. A genetic algorithm is also used to minimize lead times of jobs in the final step. Numerical experiments of planning and scheduling with processing time uncertainty are carried out to examine the effectiveness of the proposed method.
机译:本文涉及释放时间计划,以减少制作生产环境中的工作的交货时间。在基于传统的MRP的规划系统中,使用历史数据和过去的经验估计交货期,而不是精确考虑容量限制。本文所提出的方法基于精确的向后和前进调度模拟。首先,向后仿真,其中模拟在每个截止日期开始,并基于应用部分路由的后向顺序通过车间发送。接下来,应用前向仿真来修改通过向后仿真获得的释放时间。遗传算法还用于最终步骤中最小化作业的交货时间。进行了处理时间不确定性的规划和调度的数值实验,以检查所提出的方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号