...
首页> 外文期刊>International journal of management science and engineering management >Production planning and scheduling using integrated data structures in ERP: Implementation and numerical simulation
【24h】

Production planning and scheduling using integrated data structures in ERP: Implementation and numerical simulation

机译:使用ERP中的集成数据结构进行生产计划和计划:实施和数值模拟

获取原文
获取原文并翻译 | 示例
           

摘要

This paper aims to address limitations with existing data structures and associated production planning and scheduling methods in enterprise resource planning (ERP). The methodology consists of: (ⅰ) the development of a theoretical framework of integrated data and associated planning and scheduling methods, (ⅱ) the implementation of integrated data in ERP, and (ⅲ) the development of a model for evaluating the impact of slack times on lead-time using existing data structures. Integrated data using additional relationships provide the capabilities of simultaneous and forward planning of various data elements (materials, activities, operations and resources) and finite leading of resources. Numerical simulation shows that planning of integrated data results in shorter lead-times than has been traditional. Furthermore, it is noted that integrated data with graphical display enables data maintainability, flexibility and transparency for better planning and scheduling. Furthermore, the number of assemblies and the size of operations routings at each bill of materials level have been identified as key factors impacting on production planning and scheduling, in particular lead-times. Despite implementation of integrated data in an ERP, numerical simulation is limited to one product structure and represents only a snapshot of planning and scheduling results. Thus, future research is being planned for the simulation of a large assembly network using a case from industry. This research advances understanding of the limitations of existing data in ERP and proposes an approach for overcoming some of these limitations by using integrated data.
机译:本文旨在解决企业资源计划(ERP)中现有数据结构以及相关生产计划和调度方法的局限性。该方法包括:(ⅰ)开发集成数据的理论框架以及相关的计划和调度方法,(ⅱ)在ERP中实施集成数据,以及(ⅲ)开发用于评估松弛影响的模型使用现有数据结构的交货时间。使用附加关系的集成数据提供了对各种数据元素(物料,活动,操作和资源)进行同时和前瞻性计划以及对资源进行有限领导的能力。数值模拟表明,集成数据的计划比传统方法缩短了交付周期。此外,应注意的是,具有图形显示的集成数据可实现数据的可维护性,灵活性和透明性,以实现更好的计划和调度。此外,已经确定了每个物料清单级别的装配数量和操作路线的大小,这是影响生产计划和调度(尤其是交货时间)的关键因素。尽管在ERP中实现了集成数据,但是数值模拟仅限于一种产品结构,并且仅代表计划和计划结果的快照。因此,正在计划使用行业案例对大型装配网络进行仿真研究。这项研究提高了对ERP中现有数据局限性的理解,并提出了一种通过使用集成数据来克服这些局限性的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号