【24h】

Modular Hybrid Pier for Naval Ports

机译:海军港口模块化混合码头

获取原文
获取原文并翻译 | 示例

摘要

The Modular Hybrid Pier (MHP) uses post-tensioned, high strength, lightweight concrete with corrosion resistant steel reinforcement to reduce repair costs by up to 80% over a service life of 100 years. The floating, double-decked pier will provide efficient vessel support to reduce costs of ship berthing, repair and resupply. Costly, maintenance-intensive fender piles are not required as foam-filled fenders positioned along the hull and internal fenders at mooring shafts absorb energy of vessel mooring. This provides optimum flexibility in ship classes that can be berthed. The MHP rides with the tide, maintaining constant elevation relative to ship decks thereby reducing labor expended in tending mooring lines.
机译:模块化混合墩(MHP)使用后张拉的高强度轻质混凝土和抗腐蚀钢筋,可在100年的使用寿命中将维修成本降低多达80%。浮动的双层码头将提供有效的船舶支撑,以减少船舶停泊,维修和补给的成本。不需要昂贵的维护工作量大的护舷板,因为沿船体定位的填充泡沫的护舷和系泊井处的内部护舷吸收了船舶系泊的能量。这在可以停泊的船级中提供了最佳的灵活性。 MHP随潮而行,相对于船甲板保持恒定的高度,从而减少了在系泊缆绳上花费的劳力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号