Successfully Addressing Regulatory Requirements for Linear Projects:Highlights from the Aurora Water Prairie Waters Project

机译:成功满足线性项目的法规要求:Aurora Water Prairie Waters项目的要点

获取原文
获取原文并翻译 | 示例

摘要

Linear projects confront unique permitting challenges due to the need for concurrentrnapprovals across jurisdictions with differing requirements. Regulatory requirementsrnpresent scheduling and design constraints that can create project risk and requirerndesign changes and construction delays that can ultimately jeopardize on-time projectrndelivery.rnThe City of Aurora’s Prairie Waters Project, designed to deliver up to 10,000 acrefeetrnof raw water for water purification annually by 2010, requires multijurisdictionalrncoordination and many approvals. The Project case study providesrninsight to key elements critical for successful regulatory coordination and approvalsrnand gives essential steps necessary for avoiding pitfalls associated with regulatoryrnconstraints. By integrating reliable planning strategies into initial design process andrnthroughout design and construction, project owners can reduce risk and avoidrnunexpected costs, re-work and delays. Identification of land use and regulatoryrnconstraints, costs, and schedules during the preliminary design phase is fundamental.rnSubsequent communication and relationship building with regulatory staff is vitalrnduring final design. The permitting process for large linear projects often falls outsidernof agencies’ standard review processes. Applicants should be prepared to collaboraternwith regulatory agencies to effectively provide relevant information to assist inrnagency review of the project. Applicants face a shifting landscape of requirementsrngiven agency staff turnover, updates to ordinances, and organizational changes.rnApplicants can expect differing levels of sophistication, divergent requirements, andrnvaried approaches not only from each agency having jurisdiction, but within separaterndepartments of the same agency. Even minor changes in project design or alignmentrncan impact regulatory approvals. This paper summarizes the challenges ofrnstreamlining regulatory review processes and the techniques used to enable thernPrairie Waters Project to meet an aggressive schedule.
机译:线性项目由于需要跨不同要求的辖区同时进行审批而面临独特的许可挑战。法规要求提出了可能造成项目风险的调度和设计约束,并要求设计变更和施工延误,最终可能会危害按时交付项目。奥罗拉市的草原水域项目旨在到2010年每年提供多达10,000英亩的纯净水用于净水,需要多辖区协调和许多批准。项目案例研究提供了对成功进行监管协调和批准至关重要的关键要素的洞察力,并提出了必要的必要步骤,以避免与监管约束相关的陷阱。通过将可靠的计划策略集成到初始设计流程以及整个设计和施工中,项目所有者可以降低风险并避免意外的成本,返工和延误。在初步设计阶段确定土地使用和监管的约束,成本和进度表至关重要。在最终设计期间,与监管人员的后续沟通和关系的建立至关重要。大型线性项目的许可流程通常不在机构的标准审查流程之内。申请人应准备与监管机构合作,以有效提供相关信息,以帮助对项目进行无情审查。申请人面临着机构要求的人员流动,法规更新和组织变化的需求格局的变化。申请人不仅可以从具有管辖权的每个机构,而且可以在同一机构的不同部门中期待不同的复杂程度,不同的要求和不同的方法。即使项目设计或调整中的微小更改也会影响监管审批。本文总结了简化监管审查流程所面临的挑战,以及使草原水域项目能够满足激进进度的技术。

著录项

  • 来源
  • 会议地点 San Diego CA(US);San Diego CA(US)
  • 作者

    Tara Corbett; Tom Roode;

  • 作者单位

    EDAWAECOM, 1809 Blake Street, Suite 200, Denver, CO 80202 PH (303) 308-rn3573 FAX (303) 595-4434 email: tara.corbett@edaw.com;

    rnCity of Aurora, 14707 E. 2nd Avenue, suite GL 100, Aurora, CO 80011 PH (720)rn859-4336 FAX (720) 859-4383 email: tom.roode@aurorawater.org;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管道运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号