首页> 外文会议>Offshore Technology Conference;ExxonMobil;FMCTechnologies;Schlumberger >Well Control in Carbonate Zone – Total Loss and Kick in Gas Reservoir
【24h】

Well Control in Carbonate Zone – Total Loss and Kick in Gas Reservoir

机译:碳酸盐岩带的井控–气藏的总损失和突水

获取原文
获取原文并翻译 | 示例

摘要

North Senoro Gas Field is located onshore at Sulawesi Island, operated by JOB PERTAMINA – MedcornE&P Tomori Sulawesi. The aim of North Senoro Project Development is to produce gas from limestonernreservoir (Mentawa reef) which has unique characteristic formation that total loss hazard wasn’t found atrnthe adjacent well. One of effort to solve the problems is bullheading. In this paper, it will explain howrnbullheading might become a sufficient method for controling pressure during stripping operation whilerncuring loss circulation problem. Well control situation in sandstone and carbonate formation has differentrncharacteristic. In carbonate, well control issue is mostly come by total loss which caused the mudrnhydrostatic pressure was less in the wellbore. Curing loss circulation was the first major to controlrnpressure on the well. Also on sandstone formation, has more compact if hasn’t fault or fracture on there.rnThe well control issue happened in 8-1/2" hole section; the situation occurred when suddenly got totalrnloss in the bore hole. It was followed by the increasing number of background gas from the cutting. Shutrnin well, got record of SICP is 1700 psi and SIDP is 0 psi. The operations continued with circulate gas outrnthrough choke simultaneously with original mud and LCM to try plugged the loss zone and filled up thernhole. The result was same with no indication of curing the loss problem. Decided to circulate on the twornside, through annulus and inside drill string, while circulate mud and LCM through drill pipe got plugged.rnThe engineer team made some analysis then created few scenarios, such as severing BHA, perforate drillrnpipe to make communication with annulus, continued pumping mud and LCM via annulus (bullheading),rnor stripping operation. With all assumptions and condition, the stripping operation while bullheadingrnbecame the best choice to POOH BHA and running OE to cure loss circulation with BDOP/BDOC, thenrncontinue with circulate out gas/kick. Finally, with 2 spot BDOC and the last BDOC was modified usingrnLCM to mitigate micro fracture in cement, loss circulation solved then following circulate out gas byrndriller method.rnFor total loss and kick issue, the important thing that we have to assure is pressure gradient andrnavailability of water and LCM material. Setting casing shoe at the high rating pressure will give us muchrnpossibility to select the way of curing loss circulation and kick. RIH OE pipe and spot BDOP & BDOCrnthrough OE pipe became success story to curing the loss for next well. Finally, the safety for crew,rnenvironment and production target is achieved with this option at North Senoro Gas Field.
机译:North Senoro气田位于苏拉威西岛的陆上,由JOB PERTAMINA – MedcornE&P Tomori Sulawesi经营。 North Senoro项目开发的目的是从具有独特特征的石灰岩储层(Mentawa礁)生产天然气,在相邻的井中不会发现全部损失危险。解决问题的努力之一是is逼人。在本文中,它将解释如何在消除损失循环问题的同时,如何在剥离操作中控制压力是一种足够的方法。砂岩和碳酸盐岩地层的井控情况具有不同的特征。在碳酸盐岩中,井控问题主要是由于总损失引起的,该损失导致井筒中的静水压力较小。固化损失循环是控制油井压力的第一大方法。同样,在砂岩地层上,如果没有断层或裂缝,则更加致密。rn井控问题发生在8-1 / 2“孔段中;这种情况发生在井眼突然出现全损时。 Shutrnin井得到了SICP的记录为1700 psi,SIDP的记录为0 psi,并继续进行循环气与cho裂的同时与原始泥浆和LCM一起抽出,试图堵塞损失区并填满了钻孔。结果是相同的,没有迹象表明可以解决损失问题,因此决定通过环空和钻柱内部在环流中进行循环,而通过钻杆堵塞泥浆和LCM进行循环。在切断BHA的过程中,打孔的钻管与环空连通,继续通过环空(泥头)泵送泥浆和LCM,进行剥离操作。牛头定额配给成为POOH BHA和运行OE的最佳选择,以BDOP / BDOC来治疗损失循环,然后继续循环出气/踢脚。最后,用2个点BDOC和最后一个BDOC用rnLCM进行修改以减轻水泥中的微裂缝,解决了漏失循环,然后通过旋风法循环了气体。对于总损失和反冲问题,我们必须确保的重要事情是压力梯度和可用性水和LCM材料。将套管靴设置在较高的额定压力下将使我们有更多的可能选择固化损失循环和冲击的方式。 RIH OE管和现货BDOP和BDOCrnthrough OE管成为成功弥补下一口井损失的成功案例。最后,在北西诺罗气田使用该选件可以实现船员,环境和生产目标的安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号