The Malampaya field development comprises subsea wells inrn820 metres water-depth producing via a subsea manifold andrntwo 16 inch diameter inconel clad flowlines to a shallow waterrnplatform 30 km distant. Condensate is removed on thernplatform and the dry gas is then transported via a 504 km longrn24 inch export pipeline to an onshore gas plant at Tabangaorn(Batangas, Luzon Island) for extraction of H2S. Therncondensate is stored in the platform CGS caisson prior tornexport via a short 3 km long 24 inch diameter pipeline andrnCALM buoy.rnThe Malampaya Onshore Gas Plant (OGP) at Batangas is arnvital part of the overall Shell Philippines Exploration B.V.rn(SPEX) Malampaya Deep Water Gas-to-Power Development.rnThe plant design and execution schedule was from the outsetrnextremely tight, mainly due to uncertainties during therndefinition stage on the exact requirements for H2S removal.rnConsequently, the project awarded the main EngineeringrnProcurement and Construction (EPC) contract ahead of finalrndesign optimisation.rnTo ensure an optimised design and to reduce cost withoutrnscarifying the functional requirements, the project executed arnValue Engineering exercise prior to start of detail design. Thernexercise not only resulted in a reduction of overall cost ofrn20%, it also produced a better design.rnIn addition to discussing the benefits gained through thernValue Engineering process, this paper will address the fastrntrack nature of the Project and the application of the conceptrnof Flawless Start-Up to meet the tight schedule. This involvedrnthe necessary up front work in detailed engineering,rnprocurement and construction, as well as commissioning, startrnup planning and risk analysis to support a short and troublernfree start up.rnThe paper also addresses key aspect of HSE managementrnin construction and start up for this green field project inrnBatangas, Philippines. The OGP executed some 11.3rnmanhours without a Lost Time Incident (LTI) utilising mainlyrnlocal, in most cases unskilled, labour. The project was alsorncertified to ISO 14001 from start of construction and throughrnuntil start up and full operation.
机译:Malampaya油田开发项目包括通过水下歧管产生深820米水深的海底井,以及两条直径为16英寸的铬镍铁合金包层流水线到30公里远的浅水平台。在平台上除去冷凝物,然后将干燥的气体通过504公里长的24英寸出口管道输送到Tabangaorn(吕宋岛八打雁省)的陆上天然气厂,以提取H2S。冷凝水通过出口前3公里长的24英寸直径管道和CALM浮标存储在CGS沉箱平台中。八打雁的Malampaya陆上天然气厂(OGP)是整个壳牌菲律宾勘探BVrn(SPEX)Malampaya深水的重要组成部分天然气发电。工厂的设计和执行时间表从一开始就非常紧张,这主要是由于在定义阶段对H2S去除的确切要求存在不确定性。结果,该项目提前获得了主要的工程采购与建设(EPC)合同为确保优化设计并降低成本而又不影响功能要求,该项目在开始详细设计之前执行了arnValue Engineering练习。运动不仅使总体成本降低了20%,而且还带来了更好的设计。除了讨论通过价值工程流程获得的收益外,本文还将探讨项目的快速发展本质以及无缺陷启动概念的应用-以满足紧张的日程安排。这涉及到详细的工程,采购和建设,调试,启动计划和风险分析等必要的前期工作,以支持短暂而无故障的启动。本文还论述了HSE管理在该绿色领域建设和启动的关键方面。菲律宾八打雁省inrn项目。 OGP执行了大约11.3工时,没有浪费时间事件(LTI),主要利用本地劳动力,在大多数情况下是非熟练劳动力。该项目从开始建设到正式启动并全面运行,还通过了ISO 14001认证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号