首页> 外文会议>Observatory operations: Strategies, processes, and systems IV. >Testing JWST's proposal planning system: early progress
【24h】

Testing JWST's proposal planning system: early progress

机译:测试JWST的提案计划系统:早期进度

获取原文
获取原文并翻译 | 示例

摘要

The observer program implementation, planning, and scheduling subsystems are undergoing software development forthe James Webb Space Telescope front-end ground segment and are being tested in an integrated fashion. This part ofthe ground system leverages what was developed and fine-tuned for the Hubble Space Telescope over previous decades.This paper will describe the testing design, methods, results, plus the current capabilities and elements still to bedeveloped for these subsystems through the time of publication. We will point out elements from Hubble's systems,from an operations perspective, which have been preserved for the new telescope, and those which requireredevelopment.© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
机译:观测器程序的实现,计划和调度子系统正在为James Webb太空望远镜前端地面部分进行软件开发,并正在以集成方式进行测试。地面系统的这一部分利用了过去数十年来为哈勃太空望远镜开发和微调的技术。本文将介绍测试设计,方法,结果,以及到现在为止这些子系统仍需开发的功能和要素。出版物。我们将从操作的角度指出哈勃系统中为新望远镜保留的元素,以及需要重新开发的元素。©(2012)版权所有,光电仪器工程师学会(SPIE)。摘要的下载仅允许个人使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号