首页> 外文会议>North American tunneling 2014 proceedings >Sanitation Districts of Los Angeles County Clearwater Program—Joint Water Pollution Control Plant Effluent Outfall Tunnel
【24h】

Sanitation Districts of Los Angeles County Clearwater Program—Joint Water Pollution Control Plant Effluent Outfall Tunnel

机译:洛杉矶县清洁水区卫生区—联合水污染控制厂废水排放隧道

获取原文
获取原文并翻译 | 示例

摘要

In November 2012, the Sanitation Districts of Los Angeles County finalized a comprehensivernMaster Facilities Plan (MFP) for its Clearwater Program. One of the recommendations in the MFP was tornconstruct a new Effluent Outfall Tunnel to provide sufficient capacity and redundancy for existing 8- and 12-rnfoot diameter tunnels built in 1937 and 1958, respectively. The project will involve building a new 7-mile long,rn18-foot internal diameter tunnel from the Districts’ Joint Water Pollution Control Plant to a manifold structurernat Royal Palms Beach. Connections to an existing, active 14-foot diameter force main and four existing oceanrnoutfalls ranging from 5 to 10-foot diameter are required. This paper will discuss preliminary details of therntunnel final design phase and anticipated geological features for the tunnel alignment.
机译:2012年11月,洛杉矶县环卫区为其Clearwater计划最终敲定了一项全面的总体设施计划(MFP)。 MFP中的一项建议是对新的污水排放隧道进行拆除,以为分别于1937年和1958年建造的现有直径为8英尺和12英尺的现有隧道提供足够的容量和冗余度。该项目将包括建造一条新的7英里长,18英尺内径的隧道,该隧道从各区的联合水污染控制厂到皇家棕榈滩的多头结构。需要连接到现有的活动直径为14英尺的主力管和四个直径为5至10英尺的现有海洋出口。本文将讨论隧道最终设计阶段的初步细节以及隧道定线的预期地质特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号