Risk Analysis and Management on Toronto Light Rail Transit Program Projects—A Case Study

机译:多伦多轻轨计划项目的风险分析和管理-案例研究

获取原文
获取原文并翻译 | 示例

摘要

Construction projects are typically exposed to socio-political, legal & environmental, operationalrnand market related risks increasing project costs and causing delays. A robust risk management plan provides arnproject with a systematic process for identifying, assessing, evaluating, managing and documenting risks thatrncould jeopardize the success of the project. This paper presents an application of a bottom-up risk managementrnapproach to the Metrolinx Toronto Light Rail Transit Program projects that identifies, quantifies and correlatesrnrisk and uncertainty, analyzing the collective impact of project risks using the Monte Carlo simulation techniquernto determine potential cost outcomes and associated confidence levels.
机译:建设项目通常会面临与社会政治,法律与环境,运营和市场相关的风险,这些风险会增加项目成本并造成延误。强大的风险管理计划为arnproject提供了一个系统的过程,用于识别,评估,评估,管理和记录可能危害项目成功的风险。本文介绍了自下而上的风险管理方法在Metrolinx多伦多轻轨计划项目中的应用,该方法可以识别,量化和关联风险和不确定性,并使用蒙特卡洛模拟技术来分析项目风险的总体影响,以确定潜在的成本结果和相关的置信度水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号