首页> 外文会议>North American tunneling 2014 proceedings >Tunnel Construction by a Mixed-Use Real Estate Developer
【24h】

Tunnel Construction by a Mixed-Use Real Estate Developer

机译:混合用途房地产开发商的隧道建设

获取原文
获取原文并翻译 | 示例

摘要

The Washington Navy Yard was, for over 200 years since 1799, a center for naval shipbuildingrnand outfitting. Today, a portion of the site is being redeveloped as a vibrant waterfront neighborhood by ForestrnCity Washington. DC Water’s Clean Rivers project required a 340 m (1,120 ft), 1.8 m (6 ft) inside diameterrntunnel beneath Tingey Street for control of combined sewer overflows to the Anacostia River. Forest Cityrnagreed to facilitate the Tingey Street construction since it has several projects being built concurrently inrnthe immediate area. The Tingey Street diversion sewer project put the developer, Forest City, in a significantrnproject coordination role for the publicly-funded USD $16 million tunnel. This paper describes how DC Waterrnand Forest City executed this fast-tracked, design-build project.
机译:自1799年以来,华盛顿海军造船厂一直是海军造船和outfit装中心200多年。如今,华盛顿森林城市将场地的一部分重新开发为充满活力的海滨社区。 DC Water的Clean Rivers项目需要在Tingey Street下方的一个直径340 m(1,120 ft),1.8 m(6 ft)的内部隧道内控制对Anacostia河的下水道溢流。 Forest Cityrnagreing方便Tingey Street的建设,因为它在附近地区同时建设了多个项目。 Tingey Street分流下水道项目使开发商Forest City在由政府资助的1600万美元的隧道项目中发挥了重要的项目协调作用。本文介绍了DC Waterrnand森林城如何执行此快速跟踪的设计建造项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号