Displacements of the Xingó Concrete Face Rockfill Dam-Brazil

机译:巴西Xingó混凝土面板堆石坝的位移

获取原文
获取原文并翻译 | 示例

摘要

The Xingo Hydroelectric Project is located on the Sao Francisco River,between the states of Alagoas and sergipe in the Northeast region of Brazil. The main dam is a concrete face rockfill embankment type (CFRD),with maximum height of 150 m. The upstream slab thickness varies between 0.30 and 0.70 m and it was built with vertical contraction joints,16 m apart,in two construction stages. The rockfill embankment was entirely built with gneissic and granitic rock made available by excavation for the foundation of the concrete structures. The performance of the dam during construction and operation was accompanied through monitoring instruments installed in three main sections. The reservoir impound began June 10,1994 and reached its maximum normal water level on Nov.15,1994. To monitor the vertical and horizontal displacements of the rockfill embankment three sections were chosen,representing the right abutment,the highest section in the riverbed and the left abutment.Fifteen years after the reservoir impound The largest vertical displacement of the superficial marks occurred in the central section of the dam,having reached at the crest about 615 mm.Inspections detected a crack 20 m deep close to the plinth,a set of transversal fissures 26 m deep at the slab L6 with opening of up to 35 mm and crushing of the concrete in the upper portion at the joint L12/L13. This paper presents the dam performance during construction,reservoir impounding and operation stages.
机译:Xingo水电项目位于圣弗朗西斯科河上,在巴西东北地区的阿拉戈斯州和塞尔希培州之间。主坝为混凝土面板堆石路堤,最大高度为150 m。上游平板的厚度在0.30到0.70 m之间变化,它是由垂直收缩缝建造的,相距16 m,分两个施工阶段。堆石路堤完全由片麻岩和花岗石建造而成,可通过挖掘将其用作混凝土结构的基础。大坝在施工和运营过程中的性能通过安装在三个主要部分的监控仪器来实现。水库蓄水始于1994年6月10日,并于1994年11月15日达到最高正常水位。为了监测堆石路堤的垂直和水平位移,选择了三个断面,分别代表右基台,河床最高断面和左基台。水库蓄水十五年后,浅表标记的最大垂直位移发生在中央大坝断面,已到达顶部约615 mm。检查发现靠近基座的深度为20 m,在L6平板处深度为26 m的一组横向裂缝,开口最大可达35 mm,并压碎了混凝土在接头L12 / L13的上部。本文介绍了大坝在施工,水库蓄水和运营阶段的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号