The Habits of Highly Effective Scheduling

机译:高效调度的习惯

获取原文

摘要

Projects are becoming more and more complex and costly, requiring greater attention to the management of both time and resources. Critical path method and other scheduling concepts, tools, and techniques are applicable to the majority of industries that rely on planning and scheduling professionals to effectively manage work. CPM and PERT methodologies were originally developed in the 1950's however, it was in the 1970's that CPM gained momentum by being a method used by both plaintiffs and defendants to prove cases in construction delay claims. In today's more complex times, life has become more segmented. Various skill sets have become divided for instance, there was a time when the artist was also the engineer and mathematician. There are some of the principles used in scheduling that bring those overall project management skills and needs together. These principles can be used to effectively communicate the plan, establish production goals, monitor and manage progress and manage change in projects and programs.
机译:项目正在变得越来越复杂,昂贵,需要更多地关注两次和资源的管理。关键路径方法和其他调度概念,工具和技术适用于大多数行业,依赖规划和调度专业人员有效管理工作。 CPM和Pert方法最初在20世纪50年代开发,在1970年代,在1970年代,CPM通过由原告和被告在施工延误索赔中证明案件的方法来获得势头。在今天更复杂的时期,生活变得更加细分。各种技能组成划分,例如,艺术家也是工程师和数学家的时间。有一些用于调度的原则,使这些整体项目管理技能和需求在一起。这些原则可用于有效地传达计划,建立生产目标,监控和管理进度和管理项目和计划的变更。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号