Perfecting the Fixed Perspective Windows Delay Analysis

机译:完善固定的透视窗口延迟分析

获取原文

摘要

With the variety of Delay Analysis Techniques available to schedule reviewers and analysts, it is difficult to know and implement the most reliable and effective way of demonstrating an accurate impact calculation caused by delay. Contractual requirements for time extension requests using the common term, "Time Impact Analysis", are increasingly appearing throughout the construction industry. The broad application of the term "Time Impact Analysis" can lead to significant variances in delay calculations. Several of the AACE International's Recommended Practices (29R-03) are commonly labeled as "Time Impact Analysis". While each methodology may have its appropriate implementation, certain methodologies can be combined to produce a more reliable and accurate result. In the following paragraphs the Fixed Perspective Windows Delay Analysis ("Analysis") method will be presented, which incorporates the strengths of various retrospective methods, while minimizing, if not alleviating the weaknesses. The result is an analysis that, when prepared correctly, is simple to calculate and easy to defend.
机译:随着各种延迟分析技术可用于安排审阅者和分析师,很难知道并实现最可靠和有效的方法,可以证明由延迟引起的准确影响计算。使用共同术语的时间延长请求的合同要求“时间影响分析”,越来越多地出现在整个建筑业。术语“时间影响分析”的广泛应用可以导致延迟计算中的显着方差。 AACE International的一些推荐实践(29R-03)通常被标记为“时间影响分析”。虽然每种方法可能具有适当的实现,但可以组合某些方法以产生更可靠和准确的结果。在以下段落中,将提出固定的透视窗口延迟分析(“分析”)方法,其中包括各种回顾性方法的强度,同时最小化,如果不缓解弱点。结果是分析,当正确准备时,计算和易于防守。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号