FULL CYCLE RESOURCE EVALUATION OF SMS DEPOSITS ALONG THE ARCTIC MID OCEAN RIDGE

机译:北极中海洋山脊沿着北极中海洋山脊的全周期资源评估

获取原文

摘要

Several hydrothermal vent sites have been discovered along the portion of the Arctic Mid-Ocean Ridge (AMOR) inside the extended Norwegian continental shelf (NCS). Seafloor massive sulfide (SMS) deposits are associated with these hydrothermal vent sites. These deposits contain significant amounts of valuable metals, such as copper, zinc, gold, and silver. Loki's Castle is one of the most promising sites along the AMOR, with two 20-30 m high and 100 m wide mound-shaped SMS deposits. It is located at a water depth of 2,400 m. A production system concept is proposed for a deep-sea mining operation at Loki's Castle based on the Nautilus Minerals' Solwara 1 project. The overall cost structure and design of the Nautilus' concept is in this study regarded feasible in AMOR in spite of the difference between the operating environment for the two locations. As the only relevant operational experience is De Beers' shallow-water diamond mining off the coast of South Africa and Namibia, most of the environmental criteria used are taken from offshore drilling. Based on the net operating time, and accounting for scheduled maintenance and waiting-on-weather time, an estimate for annual average production rate and an annual production volume are estimated. Significant downtime is expected in January and July. Significant uncertainties are associated with early phases of projects. Probabilistic cost, grade and price estimates allow dealing quantitatively with uncertainties by giving input variables as probability distributions. Monte Carlo simulations are in this study run for different sets of variables, and the resulting key performance indicators are given as distributions. This paper adapts and presents a methodology normally used to assess technological and economic feasibilities of oil and gas projects. The methodology is adapted to the assessment of deep-sea mining projects and is illustrated through the assessment of the case based on Loki's Castle ore characteristics and technologies planned for the Solwara 1 project with a cost structure adjusted according to AMOR conditions. Costs for processing, refining, waste disposal and logistics after ore arrival at onshore port is not included. The ore uncertainties are huge and the resources are with the present deposit knowledge speculative. Therefore, this study do not attempt to define any reserves.
机译:几个热液喷口一直沿着北冰洋洋中脊(AMOR)扩展挪威大陆架内(NCS)的部分发现。海底块状硫化物(SMS)矿床与这些热液喷口有关。这些沉积物含有显著量有价值的金属,如铜,锌,金,银等。 Loki的城堡沿着AMOR最有前途的网站之一,用两个20-30米,高100米,宽山形短信存款。它位于2400米的水深。的生产系统的概念,提出了基于该Nautilus矿业索尔瓦拉1个项目在洛基城堡深海采矿作业。鹦鹉螺概念的整体成本结构和设计是在本研究中,尽管两个位置的操作环境之间的差异在AMOR认为是可行的。作为唯一相关的操作经验是戴比尔斯浅水开采钻石在南非和纳米比亚海岸,大部分使用的环境标准,从海上钻井取。基于净工作时间,占计划的维护和等待,对天气的时间,年平均生产速度的估计,年生产量估计。显著停机时间预计在一月和七月。显著的不确定性与项目的早期阶段有关。概率成本,档次和价格测算允许通过给输入变量的概率分布不确定性定量处理。 Monte Carlo模拟在这项研究中对不同的变量集运行,产生的关键绩效指标给出分布。本文适应并提出了一种方法,通常用于评估石油和天然气项目的技术和经济可行性。该方法适用于深海采矿项目的评估,并通过基于Loki的城堡矿石特征,并计划与成本结构索尔瓦拉1项目根据AMOR条件调整技术的情况下的评估说明。不包括在陆上港口矿石抵达之后,加工,提炼,垃圾处理成本和物流。矿石的不确定性是巨大的,资源是本矿床知识投机。因此,这项研究并不试图去定义任何储备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号