NPP SUBSEQUENT LICENSE RENEWAL: LESSONS LEARNED FROM AMP EFFECTIVENESS AUDITS

机译:NPP随后许可续约:从AMP效力审核中汲取的经验教训

获取原文

摘要

NRC staff recendy completed the analysis of first-of-a-kind effectiveness audits of Aging Management Programs (AMPs) at Ginna Nuclear Power Plant (Ginna), Nine Mile Point Nuclear Station, Unit 1 (NMP-1) and H. B. Robinson Steam Electric Plant, Unit 2 (RNP). The staff reviewed the licensee's implementation of the AMPs during the early years of the period of extended operation (PEO), from 40-60 years. This included 29 mechanical system AMPs at Ginna, 30 mechanical system AMPs at NMP-1 and 25 mechanical system AMPs at RNP. Eight structural system AMPs and seven electrical system AMPs each were reviewed at Ginna and NMP-1. At RNP, staff reviewed seven structural system AMPs and six electrical system AMPs. In addition, three AMPs associated with time-limited aging analyses (TLAAs) were reviewed at Ginna and two each at NMP-1 and RNP. The process involved NRC staff conducting onsite interviews with licensee plant personnel, with additional technical experts participating remotely. Among the areas considered by the staff during its audit activities were (1) Inspection accessibility issues, adequacy of inspection methods, and frequency of inspections; (2) Unanticipated structure and component degradation, related equipment failures, or premature repair/replacement; and (3) Trending information that can yield insights regarding the actual effectiveness of the current AMPs and aging management reviews (AMRs). The knowledge obtained from these audits was a primary source enabling the staff to develop new subsequent license renewal guidance documents (SLRGDs), to be used following the first PEO. The existing license renewal guidance documents (LRGDs, such as NUREGs-1800 and-1801) are being significantly revised for subsequent license renewal (SLR).
机译:NRC工作人员接近完成了Ginna核电站(Ginna),九英里核电站,1(NMP-1)和HB Robinson Steam Electrice植物,单位2(RNP)。工作人员在40-60岁之间审查了被许可人在延长行动期限(PEO)的初期实施安培的执行情况。这包括Ginna的29个机械系统放大器,在RNP的NMP-1和25个机械系统AMPS的30个机械系统AMPS。在Ginna和NMP-1中审查了八个结构系统AMP和七种电气系统AMP。在RNP,工作人员审查了七个结构系统安培和六种电气系统安培。另外,在NMP-1和RNP下,在Ginna和两次中审查了与时效分析(TLAAS)相关的三个AMPS。该过程涉及NRC工作人员在授权贩运人员进行现场访谈,额外的技术专家远程参加。在审计活动期间,工作人员考虑的地区是(1)检验可访问性问题,检查方法的充分性和检查频率; (2)意想不到的结构和部件降解,相关设备故障,或过早修复/更换; (3)趋势信息,可以在目前的安培和老龄化管理评论(AMRS)的实际效益中产生见解。从这些审计中获得的知识是一个主要来源,使工作人员能够在第一个PEO之后开发新的后续许可续订指导文件(SLRGDS)。对于后续许可续约(SLR),现有许可续订指导文件(LRGDS,例如NUREGS-1800和-1801)正在大幅度修订。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号