The NRC is nearly half-way through an anticipated 12-year cycle for license renewal, beginning with the Calvert Cliffs Nuclear Power Plant (NPP). The NRC is using this experience to update the license renewal guidance (LRG) documents to support the process. The process of power reactor license renewal has produced considerable experience in recent years, with 33 NPP operating licenses already renewed and license renewal applications (LRAs) for 16 additional NPPs being processed (Table 1). If NRC approves the applications currently being reviewed, approximately 50% of the licensed operating reactors will have extended their life span by 20 years. As license renewal is voluntary, the licensee decides whether to seek license renewal and, if so, the timing of the LRA. To further improve the effectiveness and efficiency of the review, the NRC has established a streamlined process for reviewing LRAs in a consistent and timely manner. The NRC has developed a number of internationally available LRG documents to describe the interrelated aspects of preparing and reviewing LRAs. As an example, the Generic Aging Lessons Learned (GALL) Report catalogs plant structures and components; lists the materials, environments, aging effects and mechanisms; and documents how existing commonly used plant programs can be used or modified to mitigate or manage these aging effects. The LRG documents published in 2001 have been revised to incorporate lessons learned from the review of these previous LRAs. An operating experience review, for both domestic and international reactors, was also performed to study aging degradation of passive components.
机译:从Calvert悬崖核电厂(NPP)开始,NRC的许可证更新周期预计将达到12年,这一周期将近一半。 NRC正在利用这种经验来更新许可证续订指南(LRG)文档以支持该过程。近年来,动力反应堆许可证的更新过程产生了可观的经验,已经续签了33个NPP运行许可证,并且正在处理16个附加NPP的许可证更新申请(LRA)(表1)。如果NRC批准当前正在审查的申请,则大约50%的许可运行反应堆的使用寿命将延长20年。由于许可证的更新是自愿的,因此许可证持有人决定是否寻求许可证的更新,如果是,则确定LRA的时间。为了进一步提高审核的有效性和效率,NRC建立了简化流程,以一致且及时的方式审核LRA。 NRC已开发了许多国际上可用的LRG文件,以描述准备和审查LRA的相关方面。例如,《通用老龄化经验教训》(GALL)报告对植物的结构和成分进行了分类;列出材料,环境,老化效果和机理;并记录了如何使用或修改现有的常用工厂程序以减轻或管理这些老化影响。对2001年发布的上帝抵抗军文件进行了修订,以吸收从对这些以前的上帝抵抗军的审查中学到的经验教训。还对国内和国际反应堆的运行经验进行了审查,以研究无源组件的老化退化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号