Fast Track Well Planning in Borneo

机译:婆罗洲的快速轨道良好规划

获取原文

摘要

This paper highlights the phenomenal achievement of a Malaysian operator's first fast track drilling operation in a deepwater well offshore Borneo. The collaborative well planning (CWP) method fundamental to the drilling success is discussed. The discussed drilling environment is an overpressured deepwater area that has not only forced the earlier A1 and A2 to early total depth (TD) and caused abandonment of geological targets, but also contributes to numerous operational problems. Despite the challenges, operations on A3 ST-1 required significantly less operational time cost than budgeted. The difference between the previous two wells and A3 ST-1 was that, during the planning period, multidisciplinary concerns were addressed more carefully in real-time by employing CWP to unite geoscientists, drilling engineers, and other stakeholders using 3D integrated platform technology. This CWP helped the operator meet objectives for A3 ST-1, a fast track well that required only two months of drilling time, rather than the typical 12 to 18 months. It resulted in one primary well location and six geological sidetrack scenarios being accomplished in only one day. Upon the end of the operation, Well A3 was drilled with one successful cased hole sidetrack to geological target objectives without significant operational problems. A significant portion of the success can be attributed to the proper accommodation of concerns and best practices of rig usage, engineering insights, tool usage, and geological conditions during the planning process through the common software platform that can seamlessly allow collaboration of both geoscience and engineering data. The process automation only requires key drilling parameters to construct well trajectories, which was also significant in terms of shortening the planning time. This paper describes the first application of the CWP concept in offshore Borneo, which has become a trendsetter in terms of efficient and safe deepwater drilling planning and operations.
机译:本文突出了马来西亚运营商在深水井中富豪的第一次快速钻探操作的现象。讨论了协作井规划(CWP)方法对钻井成功的基础。所讨论的钻井环境是一种过度抑制的深水区,不仅强制了早期的A1和A2至早期总深度(TD)并引起了地质目标的遗弃,而且还有助于许多操作问题。尽管有挑战,但A3 ST-1的运营需要明显不足预算的运作时间。前两个井和A3 ST-1之间的差异是,在规划期间,通过使用CWP使用CWP使用3D集成平台技术来实时仔细解决多学科问题。使用3D集成平台技术,钻探工程师和其他利益相关者。这款CWP帮助操作员满足A3 ST-1的目标,这是一个快速轨道,只需要两个月的钻井时间,而不是典型的12到18个月。它导致一个初级井位置,并且只在一天内完成了六种地质侧面场景。在操作结束时,通过一个成功的套管侧面钻孔钻孔A3,在没有重大操作问题的情况下,将一个成功的套管侧面侧向到地质目标目标。成功的重要部分可归因于通过可无缝允许地球科学和工程协作的公共软件平台,在规划过程中适当的探险级使用,工程洞察力,工具使用和地质条件的适当住宿。数据。过程自动化只需要关键钻探参数来构建井轨迹,这在缩短规划时间方面也是显着的。本文介绍了CWP概念在海上婆罗洲的第一次应用,这在高效安全的深水钻井规划和运营方面已成为一个潮流的人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号