首页> 外文会议>Transportation Association of Canada conference exhibition >Critical Parameters Governing the Planning of Calgary's Airport Trail as an Effective East-West Connector
【24h】

Critical Parameters Governing the Planning of Calgary's Airport Trail as an Effective East-West Connector

机译:统计参数管理卡尔加里机场赛车作为一种有效的东西联网连接器

获取原文

摘要

With Calgary Airport's (YYC) growing passenger base bringing expansion of the passenger terminal and a fourth runway, the City of Calgary (City) had to decide whether to have the crossing through road, Airport Trail, to run as a continuous uninterrupted roadway; as the newly constructed runway will break Airport Trail into a discontinuous corridor. In February 2011, the decision was made by City Council to make Airport Trail continuous with a sub-lease agreement negotiated with YYC initiating the design and construction of the tunnel, along with a functional planning study of Airport Trail which this paper discusses. The planning of the corridor was atypical of standard freeway facilities. A major design challenge encountered in the study was a change in Airport Trail's roadway classification from an arterial, which has more relaxed access and movement provisions, to the reclassified skeletal standard, which emphasizes on free-flow movement and on enhanced access management. Additional modelling effort was required at the onset of the study in order to allow Airport Trail to be designed to applicable volumes. Additionally, specific attention was required at constrained locations which involved geometric design decisions to provide safer and more efficient operations. Constraints include tunnel proximity, integrating high vehicle volumes and balancing the right-of-way requirements for vehicle and LRT inside the tunnel. As well, the design of Airport Trail was to be integrated with existing infrastructure including the construction of airport infrastructure. Challenges encountered during the study are outlined and their solutions described including lessons learnt from the project.
机译:随着卡尔加里机场的(YYC)不断增长的客运基地带来的客运码头和第四条跑道的扩建,卡尔加里市(市)必须决定是否要通过路口,机场步道,为连续不间断的道路运行;作为新建成的跑道将打破机场径成不连续的走廊。在2011年2月,该决定是由市政府取得了令机场开拓者连续与YYC发起隧道的设计和施工,机场开拓者此论述的功能规划研究沿谈判分租协议。走廊的规划是非典型的标准高速公路设施。在研究中遇到的主要设计挑战是来自动脉,它具有更轻松的访问和移动规定机场开拓者的道路分类的变化,对骨骼重新分类标准,其中强调自由流动的运动和加强准入管理。额外的建模工作被要求在研究的开始,为了让机场径被设计成适用卷。此外,需要在其中涉及几何设计决策提供更安全,更高效的运营有限的位置特别注意。限制因素包括隧道接近,积分高的车辆容量和平衡车辆和轻轨隧道内的铁路地役权的要求。同时,机场步道的设计是为了与现有的基础设施,包括机场基础设施建设相结合。在研究过程中遇到的挑战进行了概述及解决方案描述,包括从项目的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号