首页> 外文会议>Transportation Association of Canada conference exhibition >Critical Parameters Governing the Planning of Calgary's Airport Trail as an Effective East-West Connector
【24h】

Critical Parameters Governing the Planning of Calgary's Airport Trail as an Effective East-West Connector

机译:控制卡尔加里机场步道作为有效的东西方联系的关键参数

获取原文

摘要

With Calgary Airport's (YYC) growing passenger base bringing expansion of the passenger terminal and a fourth runway, the City of Calgary (City) had to decide whether to have the crossing through road, Airport Trail, to run as a continuous uninterrupted roadway; as the newly constructed runway will break Airport Trail into a discontinuous corridor. In February 2011, the decision was made by City Council to make Airport Trail continuous with a sub-lease agreement negotiated with YYC initiating the design and construction of the tunnel, along with a functional planning study of Airport Trail which this paper discusses. The planning of the corridor was atypical of standard freeway facilities. A major design challenge encountered in the study was a change in Airport Trail's roadway classification from an arterial, which has more relaxed access and movement provisions, to the reclassified skeletal standard, which emphasizes on free-flow movement and on enhanced access management. Additional modelling effort was required at the onset of the study in order to allow Airport Trail to be designed to applicable volumes. Additionally, specific attention was required at constrained locations which involved geometric design decisions to provide safer and more efficient operations. Constraints include tunnel proximity, integrating high vehicle volumes and balancing the right-of-way requirements for vehicle and LRT inside the tunnel. As well, the design of Airport Trail was to be integrated with existing infrastructure including the construction of airport infrastructure. Challenges encountered during the study are outlined and their solutions described including lessons learnt from the project.
机译:随着卡尔加里机场(YYC)不断增长的旅客基础带动了旅客航站楼和第四条跑道的扩展,卡尔加里市(市)不得不决定是否要穿越机场路(Airport Trail),以作为连续不间断的道路运行;因为新建的跑道将把机场步道分成不连续的走廊。 2011年2月,市议会决定通过与YYC商定的分租协议来继续进行机场步道,以启动隧道的设计和施工,以及本文所讨论的机场步道的功能规划研究。走廊的规划与标准的高速公路设施不同。该研究中遇到的主要设计挑战是,机场步道的道路分类从具有更宽松通道和运动规定的动脉更改为侧重于自由流动和增强通道管理的重新分类的骨骼标准。在研究开始时需要额外的建模工作,以使Airport Trail可以设计成适用的体积。此外,在受约束的位置需要特别注意,这些位置涉及几何设计决策,以提供更安全,更有效的操作。约束条件包括隧道接近度,整合高车辆容量以及平衡隧道内车辆和轻轨的通行权要求。同样,机场步道的设计将与现有基础设施集成在一起,包括机场基础设施的建设。概述了研究过程中遇到的挑战,并描述了解决方案,包括从项目中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号