首页> 外文会议>International Conference on Applied and Theoretical Electricity >Current issues in the management by dispatching of the operating regime and maneuvering with long electric lines in the national power system
【24h】

Current issues in the management by dispatching of the operating regime and maneuvering with long electric lines in the national power system

机译:通过在国家电力系统中调度运营制度和使用长电线进行机动的管理中的当前问题

获取原文

摘要

The authors present in this paper the practical algorithms for calculating the voltage jump that occurs when connecting and disconnecting the long electric transmission lines from the power system. The overvoltages caused by the switching of these lines are also evaluated. These values must be taken into account by the managerial and operational staff to properly perform and coordinate manoeuvres. In the case study it was considered a (double circuit) 220 kV LEA overhead power line, for which the calculation algorithms for both no load and under load switching were customized, and two scenarios were studied, namely when the line is not compensated and when the line is compensated by a compensation coil.
机译:本文存在的作者,用于计算连接和断开电力系统的长电传输线时发生的电压跳跃的实用算法。还评估由这些线路切换引起的过电压。必须由管理人员和运营人员考虑这些价值,以适当地执行和协调操作。在实例研究中,它被认为是一个(双电路)220 kV lea架空电力线,其中无负载和负载切换的计算算法是定制的,并且研​​究了两种情况,即当线路没有补偿时,何时进行两种情况该线由补偿线圈补偿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号