首页> 外文会议>IEEE Technology and Engineering Management Conference >An Approach for Developing Integrated Decision Support System Model for Optimizing Contracting Process of Public Procurement in Pakistan
【24h】

An Approach for Developing Integrated Decision Support System Model for Optimizing Contracting Process of Public Procurement in Pakistan

机译:一种开发综合决策支持系统模型,以优化巴基斯坦公共采购缔约进程

获取原文

摘要

Public procurement expenditure accounts for 45 to 65 percent of a national budget, often equating to at least 15-20 percent of a country’s gross domestic product and these estimates are even higher for developing countries like Pakistan. Due to weaknesses in current operational procedures of Public Procurement in Pakistan, it is approximately paying between US$ 31 to US$ 62 Billion more annually than it should be for procuring of goods, works and services. The inefficiency in operations of public procurement like long lead time of process results in funds lapse of allocated budget, which simply indicates the inefficient public funds utility. As the research scope is limited to public procurement of goods so the problem of inefficient public funds utilization will amplify in form of long term forecasts, high level of inventories, high costs, high cost and slow response to end user requirements. Since Public funds are scarce in developing country like Pakistan, so to warrant the efficient use of the resources this research work lays the basis for developing a technical and business model for optimizing the operational delay in public procurement process especially the phase of contracting, as in this phase most time is consumed and it’s the most critical of all other phases, especially in public procurement of goods. This will help in developing a model in a software application form, which will act as a decision support system to procurement management to optimize the contracting phase for reduction of wastes in public procurement process, saving millions in government expenditure, act as feedback on future evaluation and positively impact socioeconomic development in Pakistan.
机译:公共采购支出占全国预算的45%至65%,往往等于8-20%的国家国内生产总值,这些估计对于巴基斯坦等发展中国家甚至更高。由于巴基斯坦公共采购的现行运营程序的缺点,每年比应采购商品,工程和服务,大约需要31美元至620亿美元。公共采购业务的低效率,如长期的进程时间导致资金流逝分配预算,这简单地表明了效率低下的公共资金效用。由于研究范围仅限于公共采购货物,因此公共资金利用率低效的问题将以长期预测,高水平库存,高成本,高成本和对最终用户要求的响应缓慢扩大。由于公共资金在巴基斯坦这样的发展中国家稀缺,因此保证资源的有效利用,这项研究工作为开发技术和商业模式的基础,以优化公共采购过程中的运营延误,尤其是缔约的阶段这一阶段大多数时间消耗,这是对所有其他阶段的最重要的,特别是在公共采购货物上。这将有助于在软件申请表中开发模型,这将作为采购管理的决策支持系统,以优化减少公共采购过程中废物的合同阶段,节省了数百万政府支出,作为未来评估的反馈积极影响巴基斯坦的社会经济发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号