首页> 外文会议>Wuhan International Conference on E-Business >A Transition of Project Evaluation Modality:From Traditional Norm to Bill Quantity — A Case in China
【24h】

A Transition of Project Evaluation Modality:From Traditional Norm to Bill Quantity — A Case in China

机译:项目评估方式的转型方式:从传统规范到比尔数量 - 以中国为例

获取原文

摘要

The traditional mode of project evaluation had seriously impeded the fair competition in China. Since July 2003, China has carried out the reform of bill project evaluation. The results of the reform, however, are not very satisfactory in the past there years. Based on the Correlation analysis study on data from questionnaires and interviews, this paper reports the status quo of the reform, discusses various factors influencing the reform, and finally proposes some suggestions to facilitate the reform.
机译:传统的项目评估模式严重阻碍了中国的公平竞争。 自2003年7月以来,中国已经开展了比尔项目评估的改革。 然而,改革的结果在过去几年中并不是很满意。 根据问卷调查和访谈数据的相关分析研究,本文报告了改革的现状,讨论了影响改革的各种因素,最后提出了一些促进改革的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号