首页> 外文会议>International Conference on Ground Control in Mining >The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery
【24h】

The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

机译:NRE Wongawilli煤矿的长墙主题支柱提取

获取原文

摘要

To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of these roadways with regard to the longwall face varied between (i) a parallel alignment where the entire roadway was simultaneously subjected to a significant increase in vertical stress on holing and (ii) a more favorable high angle of alignment, meaning that only a portion of the roadway was subjected to an increase in vertical stress on holing. In addition, the longwall holed into and was recovered in one of the existing roadways.
机译:为了维持长墙连续性,NRE Wongawilli煤矿提取了大约20岁的汤普森电源,这样做,在Longwall撤退期间钻入了20道路。这些道路关于长壁面的方向在(i)之间的平行对准之间变化,其中整个道路同时对孔的垂直应力的显着增加和(ii)更有利的大角度,这意味着只有道路的一部分受到垂直应力的增加。此外,长壁孔进入并在现有的道路之一中恢复。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号