The design/build (D/B) philosophy of contract delivery is neither new nor unusual when it comes to at-grade, elevated or high-rise structures. But when it comes to constructing underground facilities, there were no examples to be followed in early 90s in the continental United States or its territories. When DMJM+HARRIS was selected as general architectural and engineering consultant for the Tren Urbano (TU) project in Puerto Rico, one of the requirements of the Federal Transit Administration (FTA) for funding commitment was to use TU as a demonstration project utilizing design/build contract delivery method. Now fifteen years later, New York City Transit (NYCT) has instituted a similar requirement for their first Tunnel Boring Machine (TBM) contract for the Second Avenue Subway. As with most construction mega-projects, lots of things have happened and there were several lessons learned from the TU experience that are now being applied to Second Avenue. Both of these projects require building tunnels and underground transit facilities in heavily traveled corridors of an urban city, in the vicinity of active business and commercial enterprises. To enhance the challenge, there are noise and vibration sensitive and historic urban receptors either over or along both the transit corridors. Column free Tren Urbano station caverns over 18 m (60 ft.) wide were built in soft ground conditions within 3.6 m (12 ft.) of the surface under an aging heavy utility corridor, while NYCT tunnels with station structures stretching the limits of rock caverns to 34.8 m (100 ft.), were planned in rocky geology with the presence of shear and fault zones and some mixed face conditions.
机译:在级别,高升高或高层结构方面,合同交付的设计/构建(D / B)哲学既不是新的也不是不寻常的。但是,当涉及建造地下设施时,美国大陆的90年代初没有遵循的例子。当DMJM +哈里斯被选为波多黎各的Tren Urbano(涂族)项目的普通建筑和工程顾问时,联邦过境管理局(FTA)的资金承诺的要求之一是使用TU作为利用设计/的示范项目建立合同交付方法。现在十五年后,纽约市际过境(NYCT)为第二大道地铁的第一台隧道无聊机(TBM)合同提供了类似的要求。与大多数建筑巨型项目一样,发生了很多事情,并且从现在正在应用于第二大道的TU经验中吸取了几课。这两个项目都需要在城市的大量旅行的走廊中建造隧道和地下过境设施,在积极的商业和商业企业附近。为了增强挑战,在过境走廊上有噪音和振动敏感和历史城市受体。柱子柱子张大全在18米(60英尺)的洞穴中宽阔的洞穴内置于一台老化的耐用性走廊的表面3.6米(12英尺)的柔软地段内。Nyct隧道与延伸岩石的限制洞穴到34.8米(100英尺),计划在岩石地质中,存在剪切和断层区域和一些混合面条状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号