首页> 外文会议>Rapid Excavation and Tunneling Conference >Delivery of Design, Environmental Statement, Engineering, Construction Management of the UK's New High Speed Railway for the 21st Century
【24h】

Delivery of Design, Environmental Statement, Engineering, Construction Management of the UK's New High Speed Railway for the 21st Century

机译:21世纪,英国新型高速铁路设计,环境陈述,工程,建设管理的交付

获取原文

摘要

High Speed Two (HS2) is a new $67billion (56 billion pounds) high speed railway which will form a "spine" of a reshaped rail network providing an engine for growth and connecting eight out of the top ten regions within Great Britain. There are about 64km of twin bore and 8km of twin cell cut-and-cover tunnels. Principles of Systems Engineering (International Council on Systems Engineering (INCOSE)) have been incorporated to drive processes and approaches to underground structure design & construction. In addition, HS2 Ltd established an efficiency challenge programme specifically tasked with generating savings for the project through updating and refining existing standards/ guidance documents in geotechnical engineering and underground construction. This paper describes aspects of the design, engineering & construction management and environmental aspects to ensure high quality and cost effective underground structures for this innovative high speed railway including HS2s approach to tunnel porous portal designs for the various HS2 underground structures.
机译:高速二(HS2)是新的67亿美元(560亿英镑)的高速铁路,该高速铁路将形成一个被重塑铁路网络的“脊柱”,提供发动机,用于增长,并在英国十大区域中连接八个。大约有64公里的双孔和8km的双细胞切割隧道。系统工程原则(国际系统工程理事会(侵入))已被纳入驱动地下结构设计和建筑的过程和方法。此外,HS2 LTD还通过更新和炼制地岩土工程和地下建设中的现有标准/指导文件,确立了一个效率挑战计划,专门任务,通过更新和改进现有标准/指导文件来为项目提供节省。本文介绍了设计,工程和施工管理和环境方面的各个方面,以确保这种创新高速铁路的高质量和成本有效的地下结构,包括HS2S隧道多孔门户网站设计的隧道各种HS2地下结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号