Sequential Excavation Method with Ground Freezing for DC Water's First Street Tunnel

机译:直流水第一街道隧道冻结的顺序挖掘方法

获取原文

摘要

Mined tunnel excavation for DC Water's First Street Tunnel project in an urban residential neighborhood with complex ground conditions; required the utilization of ground improvement with ground freezing. A total of three connection tunnels (adits) of different size and geometry have been constructed between deep drop shafts and the main tunnel, which was excavated by Tunnel Boring Machine. This paper is focused on the adit design challenges and contractor's means and methods to successfully deliver this project. The application of vertical ground freezing required innovative construction sequencing, unique solutions to maintain the freeze during excavation, and deliberate equipment selection. Lessons learned from the design through construction are provided.
机译:在城市住宅邻居中挖掘DC水的街道隧道项目的挖掘隧道挖掘;需要利用地面改善与地面冻结。在深落轴和主隧道之间构造了不同尺寸和几何形状的三个连接隧道(配合),由隧道镗床挖掘出来。本文专注于Adit设计挑战和承包商的手段和方法,以成功提供该项目。垂直地冻结冻结所需的创新施工测序,独特的解决方案,在挖掘过程中保持冻结,并刻意设备选择。提供了通过施工从设计中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号