An Overview of the SR99 TBM Access Shaft,Seattle, Washington

机译:SR99 TBM Access Shaft的概述,西雅图,华盛顿州

获取原文

摘要

The SR99 bored tunnel will replace the seismically vulnerable, double-deck Alaskan Way Viaduct. "Bertha," at 57.3-ft in diameter, was, at the time, the largest EPB-TBM in the world. The TBM launched in July 2013 and stopped after mining approximately 1000-ft when it was discovered that the outer seals had been damaged. An access shaft was installed in front of the TBM to facilitate removal and repair of the cutter head assembly. Access shaft design and construction overcame difficulties including buried structures, archaeological concerns, limited site access, complex geology, adverse groundwater conditions, and proximity to the adjacent viaduct that remained in service. The project required installation of deep secant piles up to 10-ft diameter, multi-stage dewatering, structural and hydraulic grouting, structural and geotechnical modeling, and real-time instrumentation. The TBM successfully mined into the access shaft in early 2015 and the 2000-tonne cutter head was removed from the shaft via modular lift tower supported on the shaft.
机译:SR99钻孔隧道将取代地震脆弱的双层阿拉斯加的高架桥。 “Bertha,”直径为57.3英快“,当时是世界上最大的EPB-TBM。 TBM于2013年7月推出并在发现外部密封损坏后挖掘大约1000英尺的矿井后停止。进入轴安装在TBM的前面,以便于切割和修理切割头组件。进入轴设计和施工越来越困难,包括掩埋结构,考古关注,有限的场地访问,复杂地质,不良地下水条件,以及靠近服务的高架桥的附近。该项目需要安装深度线桩,高达10英尺直径,多级脱水,结构和液压灌浆,结构和岩土性建模,以及实时仪器。 2015年初,TBM成功地进入进入轴,通过支撑在轴上的模块化升力塔从轴上取出2000吨刀头。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号