Completing the Second Avenue Subway Project, New York

机译:完成第二大道地铁项目,纽约

获取原文

摘要

Phase 1 of the Second Avenue Subway Project is due for completion in December 2016. At a cost of $4.5 billion this phase will provide 4 new stations and 2 miles of new tunnels to extend the existing Q line to the upper east side of Manhattan. Future phases will extend north into Harlem and south to the Financial District.This paper will focus on the challenges of completing and fitting out the tunnels, caverns and cut and cover structures previously constructed. The complexity of completing the platforms, mezzanines, public, back of house and ancillary structures together with interfacing with adjacent properties, utilities and third parties will be covered. In particular the lessons learned from the installation of track, escalators, elevators, architectural finishes and systems integration to a tight schedule while accommodating design changes will be covered. Particular focus will be paid to waterproofing methods used and remedial work done prior to completion.
机译:第二大道地铁项目的第1阶段将于2016年12月完成。该阶段的费用为45亿美元,将提供4个新站和2英里的新隧道,以将现有的Q线扩展到曼哈顿的上东侧。未来的阶段将朝鲜延伸到哈林和南到金融区。本文将重点关注完成和安装先前构建的隧道,洞穴和切割和覆盖结构的挑战。将涵盖完成平台,夹层,公共,房屋和辅助结构的复杂性,将涵盖与相邻属性,公用事业和第三方的接口相互作用。特别是从安装轨道,自动扶梯,电梯,架构饰面和系统集成到紧密时间表的经验教训将被覆盖,同时将覆盖适应设计变更。将在完成之前使用特殊的重点和使用的防水方法和修复工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号