SEM Cavern Construction in Downtown LA

机译:洛杉矶市中心的SEM洞穴建筑

获取原文

摘要

The Regional Connector Transit Corridor is a 1.9-mile-long light-rail (LRT) line that will link existing LRT and subway lines to improve mobility within Downtown Los Angeles and throughout the greater City area. A challenging and risky adverse element of this $1-billion design-build project consists of a 287 ft long, 58 ft wide and 36 ft high track crossover structure which is being constructed at relatively shallow depth in soft rock beneath existing building foundations and major utilities using Sequential Excavation Methods (SEM). Through a combination of monitoring data, test results and field observations this paper correlates construction performance with design assumptions and analysis and demonstrates how collaboration between designer, contractor and owner is key to successfully adapt to changes during construction.
机译:区域连接器过境走廊是一个1.9英里长的轻轨(LRT)线,将连接现有的LRT和地铁线,以改善洛杉矶市中心和整个城市地区的流动性。这一价值10亿美元的设计建设项目的挑战性和危险的不利因素包括287英尺长,58英尺宽,36英尺高轨道交叉结构,该结构在现有的建筑基础和主要公用事业中的软岩中的相对较浅的深度处。使用顺序挖掘方法(SEM)。通过监测数据的组合,测试结果和现场观测本文将施工性能与设计假设和分析相关联,并演示了设计人员,承包商和所有者之间的协作是如何成功适应施工期间更改的关键。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号