Minimizing Impacts to the Community and Commuters: Constructing the District of Columbia's Largest Tunnel Along a Major Urban Artery

机译:最大限度地减少对社区和通勤者的影响:沿着一个主要的城市动脉构建哥伦比亚最大的隧道区

获取原文

摘要

Construction is underway on the District of Columbia Water and Sewer Authority's largest component of its project portfolio in one of the most heavily populated areas of the Nation's Capital. The Northeast Boundary Tunnel is aligned along a major arterial roadway and targeted at relieving areas plagued by chronic flooding due to under-capacity sewers. This paper discusses the processes used to design community and traffic mitigation measures in the design-build contract and the actual implementation of these measures as part of the construction efforts. Focus will be placed on project milestones, mitigation of impacts, and safety.
机译:建设正在哥伦比亚水域和下水道管理局的最大组成部分在国家资本最严重的地区之一。东北边界隧道沿着主要的动脉道路对齐,并针对由于产能下水道的慢性洪水困扰的缓解区域。本文讨论了用于设计设计 - 建立合同中的社区和交通缓解措施的过程以及作为建造努力的一部分的这些措施的实际实施。重点将被置于项目里程碑,减缓影响和安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号